Case study · Lecce
41 canopies. 7 days. Lecce.
82 parking spaces and a structure ready for 285 kW. All canopy materials by Msolar: from order to site in 45 days.
The project
A car park that becomes a plant
Not a render. A live site in Salento, with Msolar structures already in place.
For a commercial car park in Lecce we produced and supplied 41 Easy Fast canopies: 82 covered parking spaces and a structure sized for a 285 kW PV plant. All canopy materials come from the Msolar / Muzzolon Industries hub.
The difference is speed. From order we are on site in 45 days. Structure installation: 7 days. Modules, ballast, repeatable geometry: the site moves without surprises.
How it went
- Order Easy Fast configuration, quantities and PV-ready layout defined in the project.
- 45 days Manufacturing, preparation and materials on site in Lecce.
- 7 days Installation of 41 canopies: 82 spaces ready for PV modules.
The site, at full scale
Easy Fast structures in place: galvanized steel, ballast blocks and full rows. Tap a photo to enlarge.
Solution used
Easy Fast
Easy Fast 60 line: galvanized steel structure, ground ballast, ready for PV modules. Built for commercial parking where timelines and repeatability matter.
Project FAQs
Did Msolar also install the panels?
Msolar produced and supplied the canopy structures. The 285 kW figure is the plant capacity the structures are designed for; modules and electrical connection stay with the installer or PV partner.
Why are the timelines so short?
Easy Fast is a modular system manufactured in-plant. On site you assemble, you do not invent. For Lecce: 45 days from order to site, 7 days to install the structures.
Can I replicate a similar project?
Yes. Tell us parking spaces, location and desired timeline: we will prepare a proposal on Easy Fast or another Msolar line.
Want a result like Lecce?
Tell us parking spaces, timeline and site: we will prepare a tailored technical proposal.
Share this case study
Send it to a colleague, an installer or your project team.